How big would the Waitaha Hydro Project’s footprint be?

The entire Waitaha catchment is more than 31,000 hectares in size. The total footprint of this hydro scheme, once built, would be about 3.6 hectares – or 0.01% of the entire catchment.  The scheme would have an impact on about 2.6 kilometres of the total 36 kilometre river – about 7% of the river’s length.